Sunday, March 30, 2014

Sunday Morning

I had a root canal type procedure done Friday, it was warranty work on a root canal done several months ago. The first was bad enough, a second is a PITA. Anyway the side of my face is swollen, my jaw hurts and I've very little sleep for the last couple of nights. That's the bad news, the good is sleepless nights are usually spent in the shop and the last couple held true to form.

I ordered a couple of tapered irons from LV and they arrived just in time to make a plane last night. It is in the clamps as I type, once out of the clamps I'll drill for the cross pin and finish the wedge. It will be interesting to see how it works vs. a double iron plane made the same way and of the same wood.

I'm also sawing the tenons for the third side table. I had hoped to finish it this weekend but no joy, Friday was lost because of the root canal and Saturday wasn't a lot better and today I will lose some time taking the critters for a ride in the truck.

One thing I did accomplish this weekend was ordering the Beech for a new work bench build but most of all sleepless nights afford time to think (sometimes thinking is the reason for the sleepless night, yeah I know it gets a little circular), The thoughts de jour were how can anyone live with out making things, it doesn't have to be furniture, it could be anything but I would be lost without tools and work. A life of TV, booze, and whatever would be one not worth living.

3 comments:

  1. This comment has been removed by the author.

    ReplyDelete
  2. I look forward to hearing how the single iron works vs the double.

    ReplyDelete
  3. Mike,

    I have not tried it on difficult wood but on some Cherry it seems to hold the set very well. As you know some wood stock planes are easier to set than others so this may just be the plane but it is very easy to make small changes in set.

    ken

    ReplyDelete